Case Study
| Resources |
Pipeline External Corrosion Direct Assessment (ECDA) Project
Client: Chevron Global Solutions
Location: Maracaibo, Venezuela
TechCorr was contracted by Chevron Global Solutions to perform an ECDA (External Corrosion Direct Assessment) and ICDA (Internal Corrosion Direct Assessment) on a 26" diameter 28.6 kilometer buried pipeline system. This is the only pipeline system between the Chevron Boscan production field and Bajo Grande loading terminals. Failure along this pipeline would cut off nearly 123,000 barrels of oil per day to markets world wide.