Case Studies


TechCorr's reputation is based on our project successes; the delivery of safe, on-time, on-budget projects by quality personnel. TechCorr performs a post mortem inspection of all the projects we complete to help us improve on every project. Below is a partial list of case studies that you can select for further review and evaluation. Contact TechCorr directly for a complete list of case studies and/or access to more detailed information as required.

 

TitleDate
Pipeline Integrity Assessment Project
Client: Toltest Engineering
Location: Monathan Airforce Base - Tucson, Arizona

TechCorr was contracted by Toltest Engineering to perform a detailed engineering assessment on the critical fuel piping system at Davis Monathan Airforce Base located in Tucson Arizona. The piping system is designed to fuel US Airforce Fighter Jets. The engineering assessment was designed in accordance with API 570 procedures incorporating visual inspection of all equipment components, ultrasonic thickness surveys on equipment components, hydrostatic testing of main fuel pipeline, guided wave ultrasonic testing on main fuel line and cathodic protection system audit to assure appropriate level three protection. A detailed engineering assessment was completed following the field data collection phase to develop a corrosion mitigation program.
Feb 16, 2009
Advanced Aboveground Storage Tank Inspections – In-Service Robotics
This paper describes the tank inspection requirements (such as New Source Performance Standards
[NSPS], 40 CFR 60), conventional inspection techniques (out-of-service, manual, confined space
entry, and visual), advanced inspection technologies (in-service robotics), benefits derived from using
these advanced technologies, and the status of approval of these technologies by regulatory agencies.
The authors also review the unique challenges and implementation circumstances associated with
advanced inspection technologies. Finally, the authors present a pilot study currently in progress for
the application of advanced inspection technologies to an Internal Floating Roof (IFR) tank subject to
NSPS Subpart Kb (Standards of Performance for Volatile Organic Liquid Storage Vessels)
requirements.
Jun 02, 2009
Bottom Line Surprise
Emergying robotics may be one way of reducing costs, mitigating safety issues and eliminating the environmental impacts of tank inspection.
Jun 11, 2009
Ecuador Pipeline Integrity Assessment Project
Client: Petro-Ecuador
Location: Eastern Ecuador, Amazon Rain Forest

TechCorr (Engineering Division) was contracted to review engineering, construction, inspection and maintenance procedures and practices on block # 17 (Vintage) located in the eastern Ecuador Amazon Rain Forest. The scope of work involved a detailed gathering system piping and facility review as the basis for developing a "Fixed Equipment" risk based inspection and maintenance program.
Feb 16, 2009
Mechanical Integrity Inspection Project
Client: Centragas
Location: Barranquila, Colombia

TechCorr (Inspection Division) was contracted to perform a mechanical integrity inspection using advanced guided wave ultrasonic inspection technology developed by the Pipeline Research Council International on buried compressor station piping systems. The project encompassed compressor stations throughout the Centragas pipeline network in Barranquila Colombia.
Feb 13, 2009
PDVSA Pipeline Integrity Assessment Project
Client: PDVSA Gas Anaco (National Oil Company of Venezuela)

TechCorr was contracted by PDVSA (Petroleos de Venezuela S.A.) to perform a baseline assessment on roughly 500 kilometers of production and transmission assets associated with PDVSA Anaco operating division. The pipeline diameters ranged from 2" up to 36" in diameter both buried and above ground. These pipeline transported natural gas between production fields utilized in the gas injection process as a secondary recovery technique when pressurizing oil reservoirs. Failure of these pipelines was estimated to affect over 200,000 barrels of oil production daily as reservoir pressure could not be maintained.
Feb 16, 2009
Pipeline External Corrosion Direct Assessment (ECDA) Project
Client: Chevron Global Solutions
Location: Maracaibo, Venezuela

TechCorr was contracted by Chevron Global Solutions to perform an ECDA (External Corrosion Direct Assessment) and ICDA (Internal Corrosion Direct Assessment) on a 26" diameter 28.6 kilometer buried pipeline system. This is the only pipeline system between the Chevron Boscan production field and Bajo Grande loading terminals. Failure along this pipeline would cut off nearly 123,000 barrels of oil per day to markets world wide.
Feb 16, 2009
Spider Wrap Light
The leak was at 120 psi and the hole was about 1/7th of an inch. Mr. Shahid Raza Imam who is a certified SW Applicator first applied pressure sealing rubber tape to encapsulate the leak area. Then applied 6 wraps of water activated fiber glass tape on the pressure sealing tape with 4” projections on either side.
The leak was contained and all concerned people including Field Manager Mr. Saleem Lutfi, Technicians Khalid Saleem and Ghulam Hassan lauded the product and service.
Jan 06, 2010