How TechCorr’s Robotic NDT Cut Petrochemical Downtime by 30% in 90 Days
Introduction One large petrochemical facility in the Gulf Coast had been grappling with 14 days of unexpected unplanned downtime every year. One day off was costing the company production as well as a ballooning cost and tremendous pressure on operations. The reason was no different inspection delay,